| 1.0 | Mobilization & General Requirements | β±430,000.00 |
| 2.0 | Demolition Works | β±70,000.00 |
| 3.0 | Signages (detailed in Item 13.8) | Included in Item 13 |
| 4.0 | Glass Works (Main Door, Dry Display, Take Out Display) | β±129,000.00 |
| 5.0 | Doors (Toilet, Kitchen Cooking, Janitorial, Office, Storage) | β±10,000.00 |
| 6.0 | Architectural / Fit-Out Works (Framing, Counters, Benches, Ceilings, Walls, Tiles, Paint) | β±1,041,093.00 |
| 7.0 | Electrical Works (Panel Board, Outlets/GCFI, LED Downlights, Roughing-ins & Wires) | β±225,150.00 |
| 8.0 | Mechanical / HVAC Works (FCU Relocation 3 sets) | β±180,000.00 |
| 9.0 | Plumbing Works (Drain line at back counter, water supply) | β±40,000.00 |
| 10.0 | Fire Protection Works (Extinguisher refills & smoke detector relocation) | β±22,100.00 |
| 12.0 | Stainless Works (Tables & Counter Units) | By Others |
| 13.0 | Others & Signages (Roll-up, Padded Foam, Perforated Metal, Aircon Housing, Cement Wall, Signages) | β±520,350.00 |